The following information is taken from "Services Supplement: Design and Management" from the RIBA publication "Standard Form of Agreement for the appointment of an architect"(SFA/99) available from RIBA Bookshops (http://www.ribabookshop.com)
and you should refer to the whole document.
Architect's design services:
|
|
All commissions
|
|
1.1 | Receive client's instructions
|
|
1.2 | Advise client on the need to obtain statutory approvals and of the duties of the Client under the CDM regulations
|
|
1.3 | Receive information about the site from the Client (CDM Reg 11)
|
|
1.4 | Where applicable co-operate with and pass information to the Planning Supervisor
|
|
1.5 | Visit the site and carry out an initial appraisal
|
A | Appraisal
|
|
1 | Carry out studies to determine the feasibility of the Client's requirement
|
|
2A | Review with client alternative design and construction approaches and the cost implications or
|
|
2B | Provide information for report on cost implications
|
B | Strategic Brief
|
|
1 | Receive strategic brief prepared by the client
|
C | Outline Proposals
|
|
1 | Commence development of Strategic Brief into Project Brief
|
|
2 | Prepare Outline Proposal
|
|
3A | Provide an approximation of construction costs or
|
|
3B | Provide information for cost planning
|
|
4 | Obtain Client approval to Outline Proposals and approximate construction cost
|
|
5 | Co-operate with Planning Supervisor where applicable
|
D | Detailed Proposals
|
|
1 | Complete developments of Project Brief
|
|
2 | Develop the Detailed Proposal from approved Outline Proposals
|
|
3A | Prepare a cost estimate or
|
|
3B | Provide information for preparation of cost estimate
|
|
4 | Consult statutory authorities
|
|
5 | Obtain Client approval to the Detailed Proposal showing spatial arrangements, material and appearance, and a cost estimate
|
|
6 | Prepare and submit application for full planning permission
|
E | Final Proposals
|
|
1 | Design Final Proposals from approved Detailed Proposals
|
|
2A | Revise cost estimate
|
|
2B | Provide information for revision of cost estimate
|
|
3 | Consult statutory authorities on developed design proposals
|
|
4 | Obtain Client approval to type of construction, quality of materials, standard of workmanship and revised cost estimate
|
|
5 | Advise on consequences of any subsequent changes on cost and programme
|
F | Production Information
|
|
1 | Prepare production information for tender purposes
|
|
2A | Prepare schedules of rates and/or quantities and/or schedules of works for tendering purposes and revise cost estimate, or
|
|
2B | Provide information for preparation of tender pricing documents and revision of cost estimate
|
|
3A | Prepare and make submissions under building acts and/or regulations for other statutory requirements or
|
|
3B | Prepare and give building notice under building acts and/or regulations (not applicable in Scotland)
|
|
4 | Prepare further production information for construction purposes
|
G | Tender documents
|
|
1 | Prepare and collate tender documents in sufficient detail to enable a tender or tenders to be obtained
|
|
2 | Where applicable pass final information to Planning Supervisor for pre-tender Health and Safety Plan
|
|
3A | Prepare pre-tender costs or
|
|
3B | Provide information for preparation of pre-tender cost estimate
|
H | Tender Action
|
|
1 | Contribute to appraisal and report on tenders negotiations
|
|
2 | If instructed revise production information to meet adjustments in the tender sum
|
J | Mobilisation
|
|
1 | Provide production information as requested for the building contract and for construction
|
K | Construction to Practical Completion
|
|
1 | Make visits to the works in connection with the Architect's design
|
|
2 | Provide further information reasonable required for construction
|
|
3 | Review design information from contractors or specialists
|
|
4 | Provide drawings showing the building and main lines of drainage and other information for the Health and Safety File
|
|
5 | Give general advice on operation and maintenance of the building
|
L | After Practical Completion
|
|
1 | Identify defects and make final inspections
|
|
2A | Settle Final Account or
|
|
2B | Provide information required by others for settling final account
|
NB | If the architect is to provide cost advice Alternative A applies
|
|
| If a quantity surveyor is appointed Alternative B applies
|